Inside Gemini 1: Drilling Toward Four Wilcox Pay Zones
Walk the well site with our team as the rig closes in on its first target zone, and see what disciplined, active ownership looks like on the ground.
Filmed during drilling, before the well reached total depth. Figures are as described on site at the time of filming.
See the rig, the crew and the plan, in under five minutes
Many of our partners wanted to be on site in person. This walk-through brings the well site to you, led by the head of operations on this drill.
One well, four chances to produce
Gemini 1 is drilled down through four layers of rock that can hold oil and gas. When one layer slows down, the same well can start producing from the next one.
What’s happening on site
- Adding pipe as the drill goes deeperThe crew keeps adding new sections of pipe at the top while the drill bit digs further down.
- Checking the rock while drillingA specialist team studies the rock that comes up from the hole, and adjusts the drilling fluid so the pressure underground stays under control.
- Getting ready to finish the wellOnce the target is reached, steel pipe goes down the hole and is held in place with cement, so the well is strong and sealed.
- Everything needed is on siteThe site has its own water well, fuel for the rig, and a pit that holds the used drilling fluid.
Active ownership, in plain sight
Every Summit project is evaluated on the same four pillars. Here is how they show up on a working well site.
The rock
A known formation with multiple target zones, so the well has more than one path to production.
The operator
An experienced operations lead on site, with a drilling engineer, geologist and mud logger working the well.
The infrastructure
Water, fuel, cement and casing planned before they’re needed, so the well can move from drilling to completion.
Alignment
Partners see the work as it happens. Summit’s own capital sits alongside every JV member’s.
Why the drilling stage matters to JV members
The labor, fuel, drilling fluids and site work you see in this video are intangible drilling costs. As a working interest owner, up to 100% of a project’s intangible drilling costs can be deducted in year one, against salary and business income. Your CPA should confirm how it applies to you.
Every project, Gemini 1 included, is underwritten toward Summit’s target of 3–5x over three to five years, following one framework: Buy Right, Manage Right, Exit Right.
“I want there to be fields that others gave up on that are still producing today because we showed up.”
Summit Ventures leadership, from the site walk