Pumpjacks operating at a producing oil field
Case study · From the field

Inside Gemini 1: Drilling Toward Four Wilcox Pay Zones

Walk the well site with our team as the rig closes in on its first target zone, and see what disciplined, active ownership looks like on the ground.

WellGemini 1
Target formationWilcox
Oil and gas layers targeted4
Depth when filmed~9,650 ft
First target layer~9,700 ft

Filmed during drilling, before the well reached total depth. Figures are as described on site at the time of filming.

The site walk

See the rig, the crew and the plan, in under five minutes

Many of our partners wanted to be on site in person. This walk-through brings the well site to you, led by the head of operations on this drill.

Inside the wellbore

One well, four chances to produce

Gemini 1 is drilled down through four layers of rock that can hold oil and gas. When one layer slows down, the same well can start producing from the next one.

Surface
~9,650 ftDepth when filmed
Wilcox 1~9,700 ft · first target layer
Wilcox 3~9,900 ft
Wilcox 5~10,300 ft
Wilcox 6~10,400 ft
Illustrative, not to scale above 9,600 ft. Depths as described on site.

What’s happening on site

  1. Adding pipe as the drill goes deeperThe crew keeps adding new sections of pipe at the top while the drill bit digs further down.
  2. Checking the rock while drillingA specialist team studies the rock that comes up from the hole, and adjusts the drilling fluid so the pressure underground stays under control.
  3. Getting ready to finish the wellOnce the target is reached, steel pipe goes down the hole and is held in place with cement, so the well is strong and sealed.
  4. Everything needed is on siteThe site has its own water well, fuel for the rig, and a pit that holds the used drilling fluid.
What the site walk shows

Active ownership, in plain sight

Every Summit project is evaluated on the same four pillars. Here is how they show up on a working well site.

01

The rock

A known formation with multiple target zones, so the well has more than one path to production.

02

The operator

An experienced operations lead on site, with a drilling engineer, geologist and mud logger working the well.

03

The infrastructure

Water, fuel, cement and casing planned before they’re needed, so the well can move from drilling to completion.

04

Alignment

Partners see the work as it happens. Summit’s own capital sits alongside every JV member’s.

Why the drilling stage matters to JV members

The labor, fuel, drilling fluids and site work you see in this video are intangible drilling costs. As a working interest owner, up to 100% of a project’s intangible drilling costs can be deducted in year one, against salary and business income. Your CPA should confirm how it applies to you.

Every project, Gemini 1 included, is underwritten toward Summit’s target of 3–5x over three to five years, following one framework: Buy Right, Manage Right, Exit Right.

“I want there to be fields that others gave up on that are still producing today because we showed up.”

Summit Ventures leadership, from the site walk
Keep exploring

See more of how direct ownership works

Watch our on-demand webinar, or browse guides, white papers and articles on oil and gas ownership.